Investigation of the Blowout Preventer (BOP) for the Drill String

Authors

  • A.Sh. Omarova Azerbaijan State Oil and Industry University (Baku, Azerbaijan)

DOI:

https://doi.org/10.52171/herald.324

Keywords:

clay solution , reservoir pressure, scarf, drilling belt, friction force, static load

Abstract

In the conditions of high pressure, the task of drilling column ejection is considered. From the solution of differential equation of drilling pipes columns at known values of parameters of ejection of a boring column bottom hole pressure, calling this out-break is defined.

References

1.

Canəhmədov Ə.X. Qazıma maşın və avadanlıqları. Ali texniki məktəblər üçün dərslik. Bakı: ELM, 2005. - 256 s.

2.

Gilles Gabolde, Jean-Paul, Guyen N. Drilling date handbuk. 1999, Editions Techinq Paris.

3.

Kərimov Z.H., Qurbanov P.S., Kərimov M.Z. Nəzəri mexanika, ADNA-nın nəşriyyatı. – 1996. 274 s.

4.

Beljaev N.M. Soprotivlenie materialov. – M.: Nauka, 1965. - 856 s.

5.

Ağadiyeva T.A. Neft və qaz quyularının məhsulunun toplaması sisteminin səmərəliyinin artırılması ilə enerji təhlükəsizliyinin yaxşılaşması. Azərbaycan Mühəndislik Akademiyasının Xəbərləri, 2024, сild 16 (1), s. 11-120.

DOI: https://doi.org/10.52171/2076-0515_2024_16_01_111_120

Published

2025-12-22

How to Cite

Omarova, A. (2025). Investigation of the Blowout Preventer (BOP) for the Drill String. Herald of Azerbaijan Engineering Academy, 17(4), 38–41. https://doi.org/10.52171/herald.324